Skip to content

Update callgraph.yml #2

Update callgraph.yml

Update callgraph.yml #2

Triggered via push January 7, 2026 16:27
Status Cancelled
Total duration 24s
Artifacts

cross.yml

on: push
Matrix: Test
Fit to window
Zoom out
Zoom in

Annotations

7 errors
Test (armv7-unknown-linux-gnueabihf, stable)
The run was canceled by @astefano.
Test (armv7-unknown-linux-gnueabihf, stable)
The operation was canceled.
Test (aarch64-unknown-linux-gnu, stable)
The run was canceled by @astefano.
Test (aarch64-unknown-linux-gnu, stable)
The operation was canceled.
Test (powerpc-unknown-linux-gnu, stable)
The run was canceled by @astefano.
Test (powerpc-unknown-linux-gnu, stable)
The operation was canceled.
Cross
The run was canceled by @astefano.