Skip to content

Fix Content3DGraphics #3

Fix Content3DGraphics

Fix Content3DGraphics #3

Triggered via push January 24, 2026 07:41
Status Failure
Total duration 6h 5m 29s
Artifacts 1

main.yml

on: push
Matrix: unit-test-air
Matrix: unit-test-neko
unit-test-lime-develop
15m 0s
unit-test-lime-develop
Matrix: neko-samples
Fit to window
Zoom out
Zoom in

Annotations

32 errors
unit-test-neko-haxe3
Process completed with exit code 1.
unit-test-neko (4.2.5)
Process completed with exit code 1.
unit-test-neko (4.0.5)
Process completed with exit code 1.
unit-test-neko (4.3.6)
The strategy configuration was canceled because "unit-test-neko._4_2_5" failed
unit-test-neko (4.3.6)
Process completed with exit code 1.
unit-test-neko (4.1.5)
The strategy configuration was canceled because "unit-test-neko._4_2_5" failed
unit-test-neko (4.1.5)
The operation was canceled.
docs
Process completed with exit code 1.
neko-samples (4.0.5)
Process completed with exit code 1.
neko-samples (4.2.5)
The strategy configuration was canceled because "neko-samples._4_0_5" failed
neko-samples (4.2.5)
The operation was canceled.
neko-samples (4.1.5)
The strategy configuration was canceled because "neko-samples._4_0_5" failed
neko-samples (4.1.5)
The operation was canceled.
hashlink-samples
Process completed with exit code 1.
unit-test-hashlink (4.2.5)
Process completed with exit code 1.
unit-test-hashlink (4.3.6)
The strategy configuration was canceled because "unit-test-hashlink._4_2_5" failed
neko-samples (3.4.7)
The strategy configuration was canceled because "neko-samples._4_0_5" failed
neko-samples (3.4.7)
The operation was canceled.
neko-samples (4.3.6)
The strategy configuration was canceled because "neko-samples._4_0_5" failed
neko-samples (4.3.6)
The operation was canceled.
unit-test-air (4.3.6)
Process completed with exit code 1.
unit-test-air (4.2.5)
The strategy configuration was canceled because "unit-test-air._4_3_6" failed
unit-test-air (4.2.5)
The operation was canceled.
unit-test-air (3.4.7)
The strategy configuration was canceled because "unit-test-air._4_3_6" failed
unit-test-air (3.4.7)
The operation was canceled.
unit-test-air (4.0.5)
The strategy configuration was canceled because "unit-test-air._4_3_6" failed
unit-test-air (4.0.5)
The operation was canceled.
unit-test-air (4.1.5)
The strategy configuration was canceled because "unit-test-air._4_3_6" failed
unit-test-air (4.1.5)
The operation was canceled.
flash-samples
Process completed with exit code 1.
unit-test-lime-develop
Process completed with exit code 1.
html5-samples
The job has exceeded the maximum execution time of 6h0m0s

Artifacts

Produced during runtime
Name Size Digest
openfl-haxelib Expired
2.85 MB
sha256:424c2aea69e6ad8c75f1dc2dff1f1522c8436b4c9b80d6e79b449c8bdf3fd698