Skip to content

test(sse): expand ChangeStreamSseIT — co-existence, worker lifecycle,… #1183

test(sse): expand ChangeStreamSseIT — co-existence, worker lifecycle,…

test(sse): expand ChangeStreamSseIT — co-existence, worker lifecycle,… #1183

Triggered via push June 3, 2026 06:24
Status Failure
Total duration 3m 27s
Artifacts

branch.yml

on: push
Matrix: build
Matrix: build-docker-standard
Matrix: deploy-maven-central
Fit to window
Zoom out
Zoom in

Annotations

5 errors
build (6.0)
Process completed with exit code 1.
build (8.0)
The strategy configuration was canceled because "build._6_0" failed
build (8.0)
The operation was canceled.
build (7.0)
The strategy configuration was canceled because "build._6_0" failed
build (7.0)
The operation was canceled.