Skip to content

chore: bump version to 1.1.0 #4

chore: bump version to 1.1.0

chore: bump version to 1.1.0 #4

Triggered via push December 30, 2025 11:40
Status Failure
Total duration 22s
Artifacts

ci.yml

on: push
Matrix: test
Fit to window
Zoom out
Zoom in

Annotations

6 errors
lint
Process completed with exit code 1.
test (3.11)
Process completed with exit code 4.
test (3.12)
The strategy configuration was canceled because "test._3_11" failed
test (3.12)
The operation was canceled.
test (3.10)
The strategy configuration was canceled because "test._3_11" failed
test (3.10)
The operation was canceled.