Skip to content

Upgrade sbt-github-actions from 0.23.0 to 0.27.0 #477

Upgrade sbt-github-actions from 0.23.0 to 0.27.0

Upgrade sbt-github-actions from 0.23.0 to 0.27.0 #477

Triggered via pull request August 26, 2025 14:00
Status Failure
Total duration 59s
Artifacts

ci.yml

on: pull_request
Matrix: Build and Test
Matrix: Coverage
Matrix: Earthly Checks
Matrix: Check formatting
Matrix: Microsite
Matrix: Publish Artifacts
Fit to window
Zoom out
Zoom in

Annotations

19 errors
Build and Test (ubuntu-latest, 2.12.12, adopt-hotspot@8)
Process completed with exit code 127.
Check formatting (ubuntu-latest, 2.13.10, temurin@8)
Process completed with exit code 127.
Build and Test (ubuntu-latest, 2.11.12, adopt-hotspot@11)
The operation was canceled.
Build and Test (ubuntu-latest, 2.11.12, adopt-hotspot@11)
The strategy configuration was canceled because "build.ubuntu-latest_2_12_12_ado" failed
Build and Test (ubuntu-latest, 2.12.12, adopt-hotspot@15)
The operation was canceled.
Build and Test (ubuntu-latest, 2.12.12, adopt-hotspot@15)
The strategy configuration was canceled because "build.ubuntu-latest_2_12_12_ado" failed
Build and Test (ubuntu-latest, 2.13.8, adopt-hotspot@15)
The operation was canceled.
Build and Test (ubuntu-latest, 2.13.8, adopt-hotspot@15)
The strategy configuration was canceled because "build.ubuntu-latest_2_12_12_ado" failed
Build and Test (ubuntu-latest, 2.13.8, adopt-hotspot@8)
The operation was canceled.
Build and Test (ubuntu-latest, 2.13.8, adopt-hotspot@8)
The strategy configuration was canceled because "build.ubuntu-latest_2_12_12_ado" failed
Build and Test (ubuntu-latest, 2.11.12, adopt-hotspot@8)
The operation was canceled.
Build and Test (ubuntu-latest, 2.11.12, adopt-hotspot@8)
The strategy configuration was canceled because "build.ubuntu-latest_2_12_12_ado" failed
Build and Test (ubuntu-latest, 2.11.12, adopt-hotspot@15)
The operation was canceled.
Build and Test (ubuntu-latest, 2.12.12, adopt-hotspot@11)
The operation was canceled.
Build and Test (ubuntu-latest, 2.11.12, adopt-hotspot@15)
The strategy configuration was canceled because "build.ubuntu-latest_2_12_12_ado" failed
Build and Test (ubuntu-latest, 2.12.12, adopt-hotspot@11)
The strategy configuration was canceled because "build.ubuntu-latest_2_12_12_ado" failed
Build and Test (ubuntu-latest, 2.13.8, adopt-hotspot@11)
The operation was canceled.
Build and Test (ubuntu-latest, 2.13.8, adopt-hotspot@11)
The strategy configuration was canceled because "build.ubuntu-latest_2_12_12_ado" failed
Earthly Checks (ubuntu-latest, 2.13.8, temurin@8)
Process completed with exit code 1.