Closes #
The full gate list is in CONTRIBUTING.md: Before you open a PR. These are the steps most often missed.
- The PR targets
dev, the title is a Conventional Commit, and every commit is signed. -
make ciandmake slitherpass. A gas change commits themake snapshotdiff. - A behavior change has regression tests through a diamond built from the module's recipe, and the Validation section separates offline coverage from fork coverage.
- A new or changed ERC-7201 struct is imported into
script/upgrades/StorageLayoutProbe.sol, its baseline diff frommake storage-updateis reviewed, andSTORAGE_REGISTRY.mdhas its row. - A new interface has its
ERC165_MAP_I<MODULE>_SLOTconstant andregisterInterface(), per theregisterInterfacestandard, plus a slot test. - Ported or adapted code carries the attribution line.
- No namespace or interfaceId that is live on any network has changed.
Passing CI is not an audit.