Skip to content

Bump Go to 1.24/1.25 #247

Bump Go to 1.24/1.25

Bump Go to 1.24/1.25 #247

Triggered via pull request December 1, 2025 20:21
Status Failure
Total duration 42s
Artifacts

validate.yaml

on: pull_request
Matrix: Integration Tests
Matrix: Unit Tests
Fit to window
Zoom out
Zoom in

Annotations

9 errors
Lint
golangci-lint exit with code 3
Unit Tests (1.25)
Process completed with exit code 1.
Unit Tests (1.24)
The strategy configuration was canceled because "test._1_25" failed
Unit Tests (1.24)
Process completed with exit code 1.
Integration Tests (netopeer2)
Process completed with exit code 1.
Integration Tests (csrx)
The strategy configuration was canceled because "inttest.netopeer2" failed
Integration Tests (csrx)
Process completed with exit code 1.
Integration Tests (confd)
The strategy configuration was canceled because "inttest.netopeer2" failed
Integration Tests (confd)
The operation was canceled.