Ramp-up and ramp-down models #786

@jonmaddock

Description

@jonmaddock

In GitLab by @mkovari on Jan 2, 2019, 09:29

At the moment PROCESS does not have any models for the ramp-up and ramp-down. A number of issues will arise - for example:

additional power (even more than what is needed for flat-top) is needed during the ramp-up phase to heat the plasma and access the H-mode. Additional heating power is needed also in the ramp-down phase to compensate for high radiation power losses. ...the heating and current drive systems are optimized to work during flat-top, resulting in possible low coupling of additional power to the plasma. A clear example is the NBI system, which suffers of shine-through losses (i.e. the part of the beam not ionized in the plasma and colliding with the first wall) at low plasma density during ramp-up and ramp-down phases.

(Estimate of 3D power wall loads due to Neutral Beam Injection in EU DEMO ramp-up phase)

Thought would be required to determine which aspects of the ramp-up and ramp-down should be included.

Metadata

Metadata

Assignees

Labels

EngineeringRelating to the engineering models

Type

No type

Projects

No projects

Milestone

No milestone

Relationships

None yet

Development

No branches or pull requests

Issue actions