Skip to content

Conversation

@Coldaine
Copy link
Owner

@Coldaine Coldaine commented Oct 8, 2025

Summary

Archives complete execution artifacts from the 2025-10-08 domain-based refactor split.

This PR preserves the execution documentation for the 9-PR stack (#123-#131) created from anchor/oct-06-2025.

Files Added

docs/execution/2025-10-08-domain-split/

  1. split-validation.log (21 KB)

    • Complete Phase 1-3 execution log
    • All decisions, issues, and resolutions
    • Quality metrics and lessons learned
  2. pr-stack-summary.md (11 KB)

    • Executive summary with all PR links
    • Stack visualization and timeline
    • Review checklist and merge protocol
  3. pr-stack-tracker.md (7.4 KB)

    • Live progress tracker for Phases 4-6
    • Per-PR status checkboxes
    • Blocking relationships
  4. merge-stack.sh (7.2 KB, executable)

    • Automated merge orchestration script
    • CI validation and approvals checking
    • Resume capability
  5. README.md

    • Directory overview and guide
    • Quick links to all PRs
    • Execution summary and metrics

Purpose

These artifacts serve as:

  • Historical record of the refactor execution
  • Reference guide for reviewers and future refactors
  • Automation tools for merge coordination
  • Lessons learned documentation

Related PRs

This documentation supports the following PR stack:

Review Notes

  • All files are documentation only (no code changes)
  • merge-stack.sh is marked executable
  • Files copied from /tmp/ execution environment
  • Archive preserves execution state as of 2025-10-08 06:43 UTC

Merge Timing

Recommendation: Merge this PR early (before the main stack) to preserve documentation while execution is fresh in memory.

Can be merged independently of the refactor PR stack.


Type: Documentation
Impact: None (archive only)

Archive complete execution artifacts from 2025-10-08 refactor split:
- split-validation.log: Complete Phase 1-3 execution log
- pr-stack-summary.md: Executive summary and quick reference
- pr-stack-tracker.md: Live progress tracker for Phases 4-6
- merge-stack.sh: Automated merge orchestration script
- README.md: Directory overview and documentation

Related PRs: #123-#131
Execution: 9 domain-based PRs from anchor/oct-06-2025
Copilot AI review requested due to automatic review settings October 8, 2025 06:44
Copy link

Copilot AI left a comment

Choose a reason for hiding this comment

The reason will be displayed to describe this comment to others. Learn more.

Pull Request Overview

Archives execution documentation from the October 2025 domain-based refactor that split a monolithic feature branch into 9 stacked PRs. The PR preserves complete execution artifacts including logs, tracking documents, and automation scripts for historical reference and future refactor guidance.

  • Phase 1-3 execution artifacts preserved from the 9-PR stack creation (#123-#131)
  • Comprehensive documentation includes execution logs, tracking sheets, and merge automation
  • Reference materials for reviewers and future refactor projects

Reviewed Changes

Copilot reviewed 4 out of 4 changed files in this pull request and generated no comments.

File Description
docs/execution/2025-10-08-domain-split/pr-stack-tracker.md Live progress tracker with per-PR status checkboxes and blocking relationships
docs/execution/2025-10-08-domain-split/pr-stack-summary.md Executive summary with PR links, timeline, and execution metrics
docs/execution/2025-10-08-domain-split/merge-stack.sh Automated merge orchestration script with CI validation and resume capability
docs/execution/2025-10-08-domain-split/README.md Directory overview with quick links and execution summary

Copy link

@chatgpt-codex-connector chatgpt-codex-connector bot left a comment

Choose a reason for hiding this comment

The reason will be displayed to describe this comment to others. Learn more.

💡 Codex Review

Here are some automated review suggestions for this pull request.

ℹ️ About Codex in GitHub

Your team has set up Codex to review pull requests in this repo. Reviews are triggered when you

  • Open a pull request for review
  • Mark a draft as ready
  • Comment "@codex review".

If Codex has suggestions, it will comment; otherwise it will react with 👍.

Codex can also answer questions or update the PR. Try commenting

Comment on lines +121 to +134
# Special check for PR #127 (requires both #125 and #126 merged)
check_pr_127_dependencies() {
log_info "Checking PR #127 special dependencies..."

# Check if 03-vad is merged
if ! git branch -r --merged origin/main | grep -q "origin/03-vad"; then
log_error "PR #125 (03-vad) must be merged before PR #127"
return 1
fi

# Check if 04-stt is merged
if ! git branch -r --merged origin/main | grep -q "origin/04-stt"; then
log_error "PR #126 (04-stt) must be merged before PR #127"
return 1

Choose a reason for hiding this comment

The reason will be displayed to describe this comment to others. Learn more.

P1 Badge Rework PR #127 dependency check to handle deleted branches

The check_pr_127_dependencies function treats the presence of remote branches origin/03-vad and origin/04-stt as proof that PRs #125 and #126 have merged. However, each earlier merge is executed with gh pr merge … --delete-branch, which removes the remote branch immediately after the merge. When the loop reaches PR #127, the remote branches no longer exist even though the PRs are merged, so this check always fails and the script aborts before merging the remaining stack. Dependency readiness should be determined by PR merge state (e.g., gh pr view … --json merged) or by verifying commit ancestry rather than by testing for remote branch names that are deleted during the process.

Useful? React with 👍 / 👎.

@Coldaine Coldaine closed this Oct 8, 2025
@Coldaine Coldaine deleted the archive/refactor-execution-2025-10-08 branch October 12, 2025 02:29
Sign up for free to join this conversation on GitHub. Already have an account? Sign in to comment

Labels

None yet

Projects

None yet

Development

Successfully merging this pull request may close these issues.

2 participants