Skip to content

Update to rail v2.0: Parameter changes, ephemeral DataStore and interactive package #563

Update to rail v2.0: Parameter changes, ephemeral DataStore and interactive package

Update to rail v2.0: Parameter changes, ephemeral DataStore and interactive package #563

Triggered via pull request February 3, 2026 15:56
Status Failure
Total duration 1m 38s
Artifacts

testing-and-coverage.yml

on: pull_request
Matrix: build
Fit to window
Zoom out
Zoom in

Annotations

5 errors
build (3.11)
Process completed with exit code 2.
build (3.12)
The strategy configuration was canceled because "build._3_11" failed
build (3.12)
The operation was canceled.
build (3.10)
The strategy configuration was canceled because "build._3_11" failed
build (3.10)
The operation was canceled.