Repository navigation
Progress Prizes: manual cutoff, automated draft-to-ready - #2492
Merged
Merged
Conversation
The monthly rollover no longer closes and opens Google Forms or merges the page pull request. At the cutoff the production workflow waits for the public tests and the exact Vercel preview on the rollover PR, marks the draft ready for review, and posts the manual checklist; a human switches the forms and merges. Preparation (form copy, draft PR) is unchanged. Removed: the activate, reconcile-active and verify-active operations, the activation Environment approval, the Drive activation markers and lease, the exact-main refresh/binding jobs, and the retired staging layer (bootstrap, rewind, cleanup, fault injection, smoke controls). The ready gate checks only the two checks the rollover depends on, so unrelated repository workflows on the PR commit can no longer block the cutoff. The Vercel preview verifier exits green when the PR was already merged. Co-Authored-By: Claude Fable 5.1 <noreply@anthropic.com>
|
The latest updates on your projects. Learn more about Vercel for GitHub.
|
This branch was successfully deployed
This file contains hidden or bidirectional Unicode text that may be interpreted or compiled differently than what appears below. To review, open the file in an editor that reveals hidden Unicode characters.
Learn more about bidirectional Unicode characters
Sign up for free
to join this conversation on GitHub.
Already have an account?
Sign in to comment
Add this suggestion to a batch that can be applied as a single commit.This suggestion is invalid because no changes were made to the code.Suggestions cannot be applied while the pull request is closed.Suggestions cannot be applied while viewing a subset of changes.Only one suggestion per line can be applied in a batch.Add this suggestion to a batch that can be applied as a single commit.Applying suggestions on deleted lines is not supported.You must change the existing code in this line in order to create a valid suggestion.Outdated suggestions cannot be applied.This suggestion has been applied or marked resolved.Suggestions cannot be applied from pending reviews.Suggestions cannot be applied on multi-line comments.Suggestions cannot be applied while the pull request is queued to merge.Suggestion cannot be applied right now. Please check back later.
The monthly rollover no longer switches the Google Forms or merges the page PR. At the cutoff the workflow marks the draft PR ready once the public tests and Vercel preview pass, and posts the manual checklist. Activation, reconciliation, and the retired staging layer are removed.
🤖 Generated with Claude Code
Open in [code]smith · Need help on this PR? Tag
@codesmith-botwith what you need.