Skip to content

ci(temp): full offline a2+a3 karc validation, parallel r4 - #23385

Open
Longwt123 wants to merge 8 commits into
vllm-project:mainfrom
Longwt123:ci/a2a3-karc-fed-r4
Open

Longwt123 wants to merge 8 commits into
vllm-project:mainfrom
Longwt123:ci/a2a3-karc-fed-r4

Conversation

@Longwt123

@Longwt123 Longwt123 commented Nov 26, 2026 •

Copy link
Copy Markdown

Temporary CI validation branch, rebased onto latest main with the same changes as #23357.

Purpose: run the offline a2+a3 karc validation in parallel with the in-progress run of #23357 (separate refs = separate concurrency groups, no mutual cancellation).

Do not merge.

vllm-ascend-ci and others added 8 commits June 17, 2026 20:10
Signed-off-by: Goalina <15861868579@163.com>
Signed-off-by: tfhddd <2272751277@qq.com>
Signed-off-by: tfhddd <2272751277@qq.com>
Signed-off-by: tfhddd <2272751277@qq.com>
Same validation changes as vllm-project#23357 (b731c91) rebased onto latest main:
- pr_test.yaml: stripped temp E2E matrix routed to karc fed labels
- runner_label.json / test_config.yaml: route a2/a3 to karc fed scale sets
- _selected_tests(_upstream).yaml: selected-test proxy + HTTP/1.1 for git

Purpose: run in PARALLEL with the in-progress vllm-project#23357 run (per-ref
concurrency, separate refs do not cancel each other). Do not merge.

Signed-off-by: Longwt123 <1075015495@qq.com>
@gemini-code-assist

Copy link
Copy Markdown
Contributor

Note

Gemini is unable to generate a review for this pull request due to the file types involved not being currently supported.

@github-actions

Copy link
Copy Markdown
Contributor

This pull request has conflicts, please resolve those before we can evaluate the pull request.

@github-actions

Copy link
Copy Markdown
Contributor

👋 Hi! Thank you for contributing to the vLLM Ascend project. The following points will speed up your PR merge:‌‌

  • A PR should do only one thing, smaller PRs enable faster reviews.
  • Every PR should include unit tests and end-to-end tests ‌to ensure it works and is not broken by other future PRs.
  • Write the commit message by fulfilling the PR description to help reviewer and future developers understand.

If CI fails, you can run linting and testing checks locally according Contributing and Testing.

🤖 How to trigger CI

CI runs automatically when the PR is opened or reopened. Pushing a new commit no longer re-runs the E2E CI (to save NPU runner resources), so use the comment commands below when needed. They are available to the PR author and users with triage permission or above:

  • /run — run the full PR CI gate on the latest commit.
  • /rerun — re-run the failed CI jobs (e.g. after a flaky failure).
  • /e2e — run selected E2E tests instead of the full gate.
  • /nightly / /presmoke / /weekly — run the corresponding large-scale tests (triage permission or above; blocked during the nightly maintenance window).
  • /cancel — cancel a running CI on this PR.

Note

Until the CI gate has run on a commit, the required ci-gate check stays pending and the PR cannot merge — remember to comment /run after pushing.

This branch has not been deployed

No deployments
Sign up for free to join this conversation on GitHub. Already have an account? Sign in to comment

Projects

None yet

Development

Successfully merging this pull request may close these issues.

4 participants