Skip to content

[Verify] Nightly test on main - #23426

Closed
LQDLove wants to merge 1 commit into
vllm-project:mainfrom
LQDLove:verify/nightly-main-20261126-120003
Closed

LQDLove wants to merge 1 commit into
vllm-project:mainfrom
LQDLove:verify/nightly-main-20261126-120003

Conversation

@LQDLove

@LQDLove LQDLove commented Nov 26, 2026 •

Copy link
Copy Markdown
Collaborator

Auto-created empty PR for nightly verification.

@LQDLove

LQDLove commented Nov 26, 2026 •

Copy link
Copy Markdown
Collaborator Author

/nightly DeepSeek-V4.1-Flash-w4a8-PD-MRV2
nightly command triggered.

@LQDLove LQDLove closed this Nov 26, 2026

@gemini-code-assist gemini-code-assist Bot left a comment

Copy link
Copy Markdown
Contributor

Choose a reason for hiding this comment

The reason will be displayed to describe this comment to others. Learn more.

Code Review

This pull request adds a new markdown file .verify-nightly-20261126-120003.md containing nightly verification details, including the branch name and date. There are no review comments, and I have no feedback to provide.

@github-actions github-actions Bot added the documentation Improvements or additions to documentation label Nov 26, 2026
@github-actions

Copy link
Copy Markdown
Contributor

👋 Hi! Thank you for contributing to the vLLM Ascend project. The following points will speed up your PR merge:‌‌

  • A PR should do only one thing, smaller PRs enable faster reviews.
  • Every PR should include unit tests and end-to-end tests ‌to ensure it works and is not broken by other future PRs.
  • Write the commit message by fulfilling the PR description to help reviewer and future developers understand.

If CI fails, you can run linting and testing checks locally according Contributing and Testing.

🤖 How to trigger CI

CI runs automatically when the PR is opened or reopened. Pushing a new commit no longer re-runs the E2E CI (to save NPU runner resources), so use the comment commands below when needed. They are available to the PR author and users with triage permission or above:

  • /run — run the full PR CI gate on the latest commit.
  • /rerun — re-run the failed CI jobs (e.g. after a flaky failure).
  • /e2e — run selected E2E tests instead of the full gate.
  • /nightly / /presmoke / /weekly — run the corresponding large-scale tests (triage permission or above; blocked during the nightly maintenance window).
  • /cancel — cancel a running CI on this PR.

Note

Until the CI gate has run on a commit, the required ci-gate check stays pending and the PR cannot merge — remember to comment /run after pushing.

@github-actions

Copy link
Copy Markdown
Contributor

Last updated: 2026-11-26 20:02 UTC+8 for commit 80d5a8a.

ci-gate failed. Reason:

pre-commit failed (lint / markdownlint / mypy / gitleaks). Open the failed 'pre-commit' job above, fix the reported issues in your PR, and push again. No test label is needed for this failure.

See the workflow run for full logs. This comment is updated in place on each new failure and marked as passed once the gate passes (it is kept for history, not deleted).

Sign up for free to join this conversation on GitHub. Already have an account? Sign in to comment

Labels

documentation Improvements or additions to documentation

Projects

None yet

Development

Successfully merging this pull request may close these issues.

1 participant