Skip to content

[Test] Trace the Kimi PD handoff timeout on A3 - #23458

Closed
linfeng-yuan wants to merge 2 commits into
vllm-project:mainfrom
linfeng-yuan:test/kimi-pd-decode-readiness
Closed

linfeng-yuan wants to merge 2 commits into
vllm-project:mainfrom
linfeng-yuan:test/kimi-pd-decode-readiness

Conversation

@linfeng-yuan

@linfeng-yuan linfeng-yuan commented Nov 26, 2026 •

Copy link
Copy Markdown
Collaborator

What this PR does / why we need it?

The A3 four-card Kimi MLA TP2 test intermittently hits its 180-second read timeout on the first D request with remote KV. Both servers pass their HTTP health checks and P returns transfer metadata. This happened in the HIF8 run and the MRV2 run.

This draft enables INFO logs for the Kimi P/D servers. The current revision runs the original cold handoff, with the original timeout and assertions. If the timeout recurs, the scheduler and connector logs can show which side made progress.

Does this PR introduce any user-facing change?

CI test only.

How was this patch tested?

  • On revision 9661241, a separate local D request ran before P retained remote blocks. The readiness request, remote-KV request and post-transfer local request all returned HTTP 200. The draft counter increased after the readiness probe. A3 four-card job

  • Revision e2cbd9d restores the cold handoff for comparison. Python compilation, Ruff and the A3 cold-handoff CI job passed. P and both D requests returned HTTP 200. Both isolated variants passed, so these runs do not establish that a warm-up fixes the intermittent failure.

  • The full-matrix failure with INFO logs shows successful synchronous Mooncake reads on both D ranks (29.25 and 32.87 ms). The decode engine then reported no available shared-memory broadcast block at 60 and 120 seconds. The first D completion timed out at 180 seconds. The exact worker operation that stalled is still unknown.

  • vLLM main: vllm-project/vllm@c410543

Signed-off-by: linfeng-yuan <1102311262@qq.com>
@gemini-code-assist

Copy link
Copy Markdown
Contributor

Note

Gemini is unable to generate a review for this pull request due to the file types involved not being currently supported.

@linfeng-yuan

linfeng-yuan commented Nov 26, 2026 •

Copy link
Copy Markdown
Collaborator Author

/run
[Bot]: run command skipped. E2E is already queued or running for commit 9661241ec901c03c473710d6547eefb07951f556. Comment /rerun instead if you only want to retry failed jobs.

@linfeng-yuan linfeng-yuan added the ready-precise run selected e2e test for pr label Nov 26, 2026
@github-actions github-actions Bot added module:tests and removed ready-precise run selected e2e test for pr labels Nov 26, 2026
@github-actions

Copy link
Copy Markdown
Contributor

👋 Hi! Thank you for contributing to the vLLM Ascend project. The following points will speed up your PR merge:‌‌

  • A PR should do only one thing, smaller PRs enable faster reviews.
  • Every PR should include unit tests and end-to-end tests ‌to ensure it works and is not broken by other future PRs.
  • Write the commit message by fulfilling the PR description to help reviewer and future developers understand.

If CI fails, you can run linting and testing checks locally according Contributing and Testing.

🤖 How to trigger CI

CI runs automatically when the PR is opened or reopened. Pushing a new commit no longer re-runs the E2E CI (to save NPU runner resources), so use the comment commands below when needed. They are available to the PR author and users with triage permission or above:

  • /run — run the full PR CI gate on the latest commit.
  • /rerun — re-run the failed CI jobs (e.g. after a flaky failure).
  • /e2e — run selected E2E tests instead of the full gate.
  • /nightly / /presmoke / /weekly — run the corresponding large-scale tests (triage permission or above; blocked during the nightly maintenance window).
  • /cancel — cancel a running CI on this PR.

Note

Until the CI gate has run on a commit, the required ci-gate check stays pending and the PR cannot merge — remember to comment /run after pushing.

@linfeng-yuan linfeng-yuan added the ready-precise run selected e2e test for pr label Nov 26, 2026
Signed-off-by: linfeng-yuan <1102311262@qq.com>
@linfeng-yuan linfeng-yuan changed the title [Test] Probe Kimi decode readiness before PD handoff [Test] Trace the Kimi PD handoff timeout on A3 Nov 26, 2026
@linfeng-yuan

linfeng-yuan commented Nov 26, 2026 •

Copy link
Copy Markdown
Collaborator Author

/run
[Bot]: run command accepted. E2E has been queued on the latest commit e2cbd9d7e3bc86fafc30c35fa517a4a54d8feb9e of this PR, with whatever test-scope labels the PR currently carries. Track progress in PR checks.

@vllm-ascend-ci vllm-ascend-ci added the ci-run E2E requested manually on the latest commit label Nov 26, 2026
linfeng-yuan added a commit to linfeng-yuan/vllm-ascend that referenced this pull request Nov 26, 2026
Source: vllm-project#23458 at e2cbd9d.
Signed-off-by: linfeng-yuan <1102311262@qq.com>
@github-actions github-actions Bot removed the ready-precise run selected e2e test for pr label Nov 26, 2026
Sign up for free to join this conversation on GitHub. Already have an account? Sign in to comment

Labels

ci-run E2E requested manually on the latest commit module:tests

Projects

None yet

Development

Successfully merging this pull request may close these issues.

2 participants