Skip to content

Fix ConnectionStrategy.make_connection return type #91

Fix ConnectionStrategy.make_connection return type

Fix ConnectionStrategy.make_connection return type #91

Triggered via pull request May 29, 2024 18:19
Status Failure
Total duration 58s
Artifacts

ci.yml

on: pull_request
Matrix: test
Fit to window
Zoom out
Zoom in

Annotations

11 errors
test (ubuntu-latest, 3.9)
Process completed with exit code 1.
test (macos-latest, 3.10)
The job was canceled because "ubuntu-latest_3_9" failed.
test (macos-latest, 3.12)
The job was canceled because "ubuntu-latest_3_9" failed.
test (macos-latest, 3.8)
The job was canceled because "ubuntu-latest_3_9" failed.
test (macos-latest, 3.11)
The job was canceled because "ubuntu-latest_3_9" failed.
test (ubuntu-latest, 3.8)
The job was canceled because "ubuntu-latest_3_9" failed.
test (macos-latest, 3.9)
The job was canceled because "ubuntu-latest_3_9" failed.
test (ubuntu-latest, 3.10)
The job was canceled because "ubuntu-latest_3_9" failed.
test (ubuntu-latest, 3.11)
The job was canceled because "ubuntu-latest_3_9" failed.
test (ubuntu-latest, 3.12)
The job was canceled because "ubuntu-latest_3_9" failed.
test (ubuntu-latest, 3.12)
The operation was canceled.